The project includes the following:
- Supply and installation of medium voltage (MV) switchgear panels for the expansion of 6 transmission substations.
- Construction of 5 distribution points (distributors), including MV switchgear.
- Installation of 300 medium voltage kiosks (transformer substations).
- Laying of 350 km of medium voltage cables.
- Laying of 50 km of low voltage cables.
- Erection (Planting) of 9,000 low voltage poles.
- Erection (Planting) of 200 lighting poles.
- Stringing of 1.5 million meters of low voltage wires.
- Installation of 1,000 street lighting fixtures.