Energy Projects, Infrastructure Projects

Gardenia 220/22/22 KV GIS Substation

Completed Project

CUSTOMER

Engineering Authority of Armed Forces.

ROLE

Main Contractor

CONTRACT TYPE

Lump-Sum on EPC

PROJECT STATUS

completed

PROJECT DURATION

8 Months

type

transmission project-substation

value

year

SCOPE OF WORK

Engineering, Supply,  Construction,  Testing and Commissioning.

The system includes -not limited to-:                       

    • 220 KV GIS.
    • 220/22/22 KV, 2 X 150 MVA Power Transformers.
    • Control, Protection, Metering & Measuring Systems.
    • 22 KV, MV Switchgear.
    • 220 KV Switch In Station.
    • Capacitor Bank 9 MVAR.
    • Communication Systems.
    • AC/DC Auxiliary System.
    • Civil Works.