Madkour Projects scope of work entailed the engineering, supply, construction, testing and commissioning of the switching station.
The system includes -not limited:-
-
- 22 KV SWGR for El Galala Resort.
- 22 KV SWGR for El Galala Pump Station .
- 2 * 40 MVA Power Transformer for El Galala Desalination Plant.
- 22 KV U/G Cables Connecting Substation With Resort SWGR, Pump Station SWGR and Desalination Plant SWGR.