Energy Projects, Infrastructure Projects

Egypt’s Future Agriculture (S2) 66/22 KV AIS Substation

Ongoing Project

CUSTOMER

Egyptian Air Forces

ROLE

Main Contractor

CONTRACT TYPE

Lump-Sum Price On EPC.

PROJECT STATUS

Off Grid

PROJECT DURATION

6 Months

TYPE

Transmission Projects- Substation

value

year

SCOPE OF WORK

Engineering, supply,  construction,  testing and commissioning.

The system includes -not limited to-:                      

    • 220 KV GIS.
    • 220/66 KV, 2 X 175 MVA Power Transformers.
    • 66 KV AIS Switchgear.
    • 66/22 KV, 3 X 40 MVA Power Transformers.
    • Control, Protection, Metering & Measuring Systems.
    • Telecommunication Systems.
    • AC/DC Auxiliary System.
    • Civil Works.