Egypt’s Future Agriculture (S1) 220/66/22 KV GIS/AIS Substation (Facility Management )

Completed Project

CUSTOMER

Egyptian Air Forces

ROLE

Main Contractor

CONTRACT TYPE

Lump-Sum Price On EPC.

PROJECT STATUS

Completed

PROJECT DURATION

10 Months

Type

Transmission project-Substation

Value

125,000,000 EGP

year

2017

SCOPE OF WORK

Engineering, supply,  construction,  testing and commissioning.

The system includes -not limited to-:                      

  • 66 KV AIS.
  • 22 KV, 3 X 40 MVA Power Transformers
  • Control, Protection, Metering & Measuring System.
  • 22 KV Switchgear.
  • Telecommunication Systems.
  • AC/DC Auxiliary System.
  • Earthing System.
  • Civil Works.
  • 66 KV OHTL with total length 20 KM.