Engineering, supply, construction, testing and commissioning
The system includes -not limited to-
-
- 10 Km, 220 KV OHTL To Connect With El Tebbin 500 / Watania Steel OHTL.
- Replace 8 Km, 220 KV OHTL with Thermal Conductor.
Engineering Authority of Armed Forces
Main Contractor
Lump-Sum Price On EPC
Completed
06 Months
Overhead Transmission Line
64 Million EGP
2018
Engineering, supply, construction, testing and commissioning
The system includes -not limited to-