Madkour Projects scope of work entailed the engineering, supply, construction, testing and commissioning of the under ground cables and distribution network.
The system includes -not limited:-
-
- 22 kv switchgears.
- 22 Ring main Units.
- main distribution panels.
- earthing system for rooms / outdoor panels.
- low voltage panels & cables.
- light current system raceways (Conduits & manholes).
- 22 dry transformers.
- street poles.
- UPS & Power factor panels.
- Construction Works: (Transformers Rooms & Distributers Rooms).