Madkour Project scope of work entailed the engineering, supply,construction,testing and commissioning of the MV OHTL and distribution network.
The system includes -not limited:-
-
- Design, supply and construction for MV OHTL with a total length of 600 KM
- MV Transformers 500 PCs
- RMU 40 PCS