Energy Projects, Infrastructure Projects

Al Galala Marble And Granite City 220 KV Overhead Transmission Line

Completed Project

customer

Engineering Authority of Armed Forces

role

Main Contractor

Contract Type

Lump-Sum Price On EPC

project status

Completed

project duration

06 Months

type

Overhead Transmission Line

value

64 Million EGP

year

2018

SCOPE OF WORK

Engineering, supply,  construction,  testing and commissioning

The system includes -not limited to-             

    • 10 Km, 220 KV OHTL To Connect With El Tebbin 500 / Watania Steel OHTL.
    • Replace 8 Km, 220 KV OHTL with Thermal Conductor.