Energy Projects, Infrastructure Projects

East AL-Qawmya For Cement 66/22KV GIS Substation.

Completed Project

CUSTOMER

Engineering Authority of Armed Forces

ROLE

Main Contractor

CONTRACT TYPE

Lump-Sum Price On EPC.

PROJECT STATUS

Completed

PROJECT DURATION

10 Months

type

Transmission Projects- Substation

value

149,700,000 EGP

year

2019

SCOPE OF WORK

Engineering, supply,  construction,  testing and commissioning.

The system includes -not limited to-:                 

    • 66 kV GIS.
    • 66/22 kV, 3 × 40 MVA Power Transformers.
    • 22 kV MV Switchgear.
    • Protection, Control, Metering & Measuring Systems.
    • AC/DC Auxiliary System.
    • Fire fighting and Fire hydrant System.
    • Civil Works.
    • 66 kV OHTL (9 Km).
    • 66KV UGC.