Energy Projects, Infrastructure Projects

Al-Galala Marble And Granite City 220/22/22 KV GIS Substation

Completed Project

CUSTOMER

Engineering Authority of Armed Forces

ROLE

Main Contractor

CONTRACT TYPE

Lump-Sum Price On EPC

PROJECT STATUS

Completed

PROJECT DURATION

6 Months

type

transmission project-substation

Value

Year

SCOPE OF WORK

Engineering, Supply,  Construction,  Testing and Commissioning.

The system includes -not limited to-:                

    • 220 KV GIS.
    • 2X 125 MVA 220/22/22 KV Power Transformers.
    • 22 KV Switchgear.
    • Control, Protection, Metering & Measuring System.
    • 9 MVAR Capacitor Bank.
    • AC/DC Auxiliary Systems.
    • Civil Works.